Estate Irrigation & Booster Pump System

Belvidere Park Retirement Village

Prepared by Tripple Hydro and Energy Renewables
Project Overview

Comprehensive Irrigation Solution

Tripple Hydro and Energy proposes the installation of a 75mm HDPE Estate Irrigation system to distribute borehole water across the full perimeter of Belvidere Retirement Village, including the centre garden section.

Distribution Ring

1200 metres of 75mm HDPE pipeline forming a perimeter distribution network

Connection Points

Eight structured irrigation connection points for organized access

Booster System

Three pumps with VSD control for intelligent, demand-based operation

Closed Loop Recommendation

Current Design

Open ring configuration

At security gate we propose to loop the pipeline

Recommended Enhancement

Tripple Hydro and Energy recommends consideration of a fully closed hydraulic loop at the security gate side.

  • Improved hydraulic reliability
  • Stabilized pressure across the network
  • Reduced endpoint pressure variation
  • Enhanced long-term system performance
System Design

Intelligent Parallel Booster Configuration

The system operates with three booster pumps configured in parallel, connected via communication links for coordinated operation. Pump staging adapts automatically based on irrigation demand.

Low Demand

One pump operates

Medium Demand

Two pumps operate

High Demand

Three pumps operate

Energy Efficient

Only required capacity activated at any time

Stable Pressure

Consistent delivery across all conditions

Reduced Stress

Lower mechanical wear extends lifespan

Hydraulic Performance Specifications

18 000

Litres Per Hour

Maximum system delivery capacity

5

Bar at Pump Station

Operating pressure at source

3

Bar at Endpoints

Pressure at furthest distribution points

600

Metres

Distance to furthest hydraulic endpoints

1200

Meters

Total Irrigation Pipeline

System Capabilities

The combined booster system delivers up to 18 m³/hour with approximately 5 bar operating pressure at the pump station.

Due to the 75mm distribution pipeline and estimated distance of ±1200 metres, pressure at the furthest distribution endpoints is expected to be approximately 3 bar—fully suitable for estate irrigation applications.

Even in the current open-ring configuration, the system provides adequate pressure delivery. Should the estate approve the closed loop connection at the security gate, hydraulic stability and pressure balancing will improve further.

Pipeline Distribution Network

The 75mm HDPE pipeline forms a comprehensive perimeter distribution ring around the estate. From this ring, 75mm saddles reduce to 32mm branch connections with 15mm dial valve outlets installed at structured connection nodes. This approach provides flexibility while maintaining hydraulic control and organized access points for estate maintenance or residents.

Operations

Irrigation Scheduling Recommendation

Although the system is capable of delivering up to 18 m³/hour, optimal performance will be achieved through structured scheduling.

Designated Blocks

Manage irrigation in organized sections

4–5 Hour Windows

Each residential block operates within defined timeframes

Avoid Simultaneous Use

Prevent full-estate irrigation at once

Benefits of Structured Scheduling

  • Stable pressure across the network
  • Efficient borehole utilization
  • Extended pump lifespan
  • Reduced operational strain on the system

Scope of Supply & Responsibilities

Tripple Hydro Provides

  • 75mm HDPE main distribution pipeline
  • Couplings, valves, fittings and saddles
  • Two 2.2kW VSD PMC Booster Pumps
  • Booster pump manifold assembly
  • Pump mounting rails and brackets
  • Structural poles and concrete bases
  • Limited bush clearing allowance
  • Installation labour and travel

Estate Responsibilities

  • Trenching for 75mm pipeline installation
  • Opening and integration of existing borehole pipeline
  • Installation of road sleeve for 75mm pipe (if closed loop approved)
  • Verification that sleeve diameter accommodates 75mm pipe
  • Clearing vegetation along fence line route

Note: If vegetation clearing is not completed prior to installation, external contractors may be required at additional cost.

Investment

Project Investment Summary

Materials & Equipment

Including safety factor and applied margin

R 169,024.78

Labour

Professional installation services

R 65,000.00

Travel

Transportation and logistics

R 4,500.00


Total Project Investment

Estimated installation timeline: 8–10 working days (subject to trench readiness and civil preparation)

R 238,524.78

Excluding VAT

Key System Advantages

Intelligent Control

Staged pump control with efficient energy usage

Stable Pressure

Consistent 3–4 bar irrigation pressure range

Structured Network

Perimeter distribution with reduced pressure drop

Centralized Installation

Pump room location for noise control and easy maintenance

Scalable Infrastructure

Ready for future expansion and closed-loop upgrade